Data cabling for Melbourne businesses.
Structured data cabling, the rack it lands in and the UPS that keeps it running, installed by our own crew from Tullamarine across Melbourne and Victoria.
- Sheet
- Cabling, racks & backup power
- Area served
- Melbourne & VIC
- Hours
- Mon–Fri 07:00–16:00
- Quote
- Itemised, no charge
What goes in.
Three items, quoted together because each depends on the next.
- DC-11
Structured data cabling
Cat6 or Cat6A from a patch panel to every outlet, access point, camera and door controller, carried on tray, catenary or conduit.
- Cat6 and Cat6A copper
- Outlets at desks, ceilings and plant
- Cable tray, catenary and conduit
- Labelled terminations
- DC-12
Server rack and comms room
A wall cabinet or floor rack with patch panels, switches and cable management. Everything is mounted and labelled, and spare units are left on purpose.
- Rack build and termination
- Cable management
- Everything mounted and labelled
- Spare rack units left free
- DC-13
UPS backup power
An uninterruptible power supply sized to the load in the rack, so a short outage does not take down the switch, the recorder and the door controller with it.
- Sized from the connected load
- Switch, recorder and controller on battery
- UPS runtime set by what must stay up
The choices that change the job.
A warehouse is cabled differently from an office. These four decisions are where the two part ways.
- 01 Cat6 or Cat6A.
- Cat6 carries 1 gigabit to 100 metres, which is what most desks use. Cat6A carries 10 gigabit over the same distance and costs more to buy and to terminate. The decision rule is in our Cat6 vs Cat6A guide.
- 02 Runs past 100 metres.
- A copper link is limited to 100 metres, patch leads included. From an office at the front of a warehouse to the far dock is often further than that. A longer copper run is not the fix: a run beyond 100 metres needs fibre or an intermediate cabinet, and the quote says which.
- 03 How the cable is carried.
- An office has a ceiling grid to hide catenary and tray. A warehouse does not. Cable goes on tray or in conduit fixed to the structure, above the reach of a forklift mast, and drops to a bench or dock door in conduit. The containment is often the larger part of the job.
- 04 Count devices, not desks.
- Every Wi-Fi access point, CCTV camera, door controller, printer and meeting room display needs its own run. Pulling those cables while the ceiling is open is a small addition. Reopening the ceiling for them later is a second job.
What you are handed.
The labels and the documents are the part of a cabling job you cannot see from the floor.
At commissioning
- Everything mounted and labelled: outlets, patch panel and rack.
- As-built documentation for the cabling and the rack.
- Administrator credentials and configuration for any switches and the UPS.
Ask any cabler for
- A test result for every link, by outlet number.
- The written statement that the work complies with the Wiring Rules, AS/CA S009.
A fault on an unlabelled outlet starts with a ladder and a tone tracer. A fault on a labelled one starts at the patch panel.
Site attendance and the itemised quote are at no charge and no obligation.
How a data cabling job runs.
- 01
We attend site.
We walk the cable routes, lift a ceiling tile, look at the comms cupboard and measure the longest run.
- 02
You get an itemised quote.
Cable category, outlet count, containment, rack and UPS are each a line, with the equipment named and the sequence of work set out.
- 03
Containment, then cable.
Tray, catenary and conduit go in first. Then the cable is pulled and labelled.
- 04
Termination and rack build.
Outlets and patch panels are terminated, the rack is built and the UPS is connected. Everything is mounted and labelled.
- 05
Cut-over and handover.
Moving a live network onto the new rack is scheduled out of hours and announced in advance. Then the as-built documentation, the administrator credentials and the configuration are handed over.
What the quote depends on.
No price list, because two outlets on the same wall can be very different runs. These are the things we measure.
- The number of outlets, and how many are in a ceiling or on plant rather than at a desk.
- The length of the longest runs, and whether any pass 100 metres and need fibre or an intermediate cabinet.
- Containment: whether existing tray can be used, and the working height where it cannot.
- Cable category: Cat6 or Cat6A.
- The rack: a new cabinet, or room and spare units in the one you have.
- The UPS: what has to stay up, and for how long.
- Existing cabling: whether it is kept or removed.
Cabling sits on the full schedule of what we install beside the systems that plug into it. Quoting them together stops a ceiling being opened twice.
Questions we get asked.
Cabling questions only. Cost, ownership and subscriptions are answered on the Solutions sheet.
What is structured cabling?
Who is allowed to install data cabling in Australia?
Can you join or extend a Cat6 cable?
Do we need a comms room, or will a cabinet do?
How long will a UPS keep the rack running?
What happens when a cable run is longer than 100 metres?
Related sheets.
- Solutions: everything we install The six disciplines that share this cabling, and why they are scheduled together.
- Business Wi-Fi and networking Access points and PoE switching, designed on top of the cable runs on this page.
- CCTV installation Every camera is a cable run back to the rack. Plan both from the same drawing.
- Guide: Cat6 vs Cat6A What each category carries, over what distance, and when the dearer cable is worth it.
Send us the comms cupboard.
A photo of the rack as it is now and a floor plan with the outlets marked is enough to start. Enquiries are read Monday to Friday, 07:00–16:00.
- To
- Gentex AU · Tullamarine VIC
- Reply
- Phone or email, usually the same business day
- Attending
- Mon–Fri 07:00–16:00
- Licensing
- Victorian Private Security Licence